● Solution: 50kW/100kWh All-in-One Energy Storage Cabinet
● Grid Connection Location: Exit Direction of Yuelu Toll Station, Changsha
● Grid Connection Date: June 2024
Project Overview
This project features a 50kW/100kWh all-in-one energy storage cabinet independently developed by Jiusen. Designed with integrated "storage and standby" capabilities, it supports the integration of photovoltaic and diesel generator systems. It effectively addresses the critical need for 24/7 uninterrupted power supply at key expressway facilities like toll stations, service areas, and tunnels.
Core Value Delivered